If a road has deteriorated too much – the fundamental structure of the road is in too poor a condition – it will be considered for resurfacing or more extensive work when the road can be made a priority for funding.
Resurfacing takes much longer than other repairs like surface dressing. Often the road has to be closed completely and traffic diverted meaning longer journey times and some inconvenience for local road users. We always do our best to minimise delays as far as possible.
We intend to invest more than £8.1 million during 2025/2026 to resurface 42 sections of road across the county, covering 62,500 square metres.
The sites we will resurface are:
- A515 Biggin to Hartington, Dovedale
- Station Road (phase 3), Hadfield, Etherow / Glossop and Charlesworth
- A615 Bakewell Road, Matlock
- A6005 Nottingham Road / Waverley Street roundabout, Long Eaton
- A61 Watchorn roundabout, Alfreton, Alfreton and Somercotes
- A6 Derby Road, Cromford, Wirksworth
- B6150 Storrs Road, Chesterfield, Walton and West
- C89 Green Lane, Ockbrook, Sandiacre
- A6 Derby Road, Whatstandwell, Alport and Derwent
- A6015 Albion Road / Union Road, New Mills
- Kilbourne Road, Belper
- North Street, Whaley Thorns, Bolsover South
- Meal Street, New Mills
- Woodhouse Lane, Bolsover, Bolsover North
- Marshall Street, Alfreton, Alfreton and Somercotes
- Beetwell Street, Chesterfield, Spire
- Nottingham Lane, Ironville, Alfreton and Somercotes
- Hope Street, Glossop, Glossop and Charlesworth
- A619 Chatsworth Road, Chesterfield, Walton and West /Boythorpe and Brampton South
- Gladstone Street, Glossop, Glossop and Charlesworth
- Silk Hill, Buxworth, Whaley Bridge
- Station Approach, Buxton, Buxton West
- Cotes Park Lane (phase 1), Somercotes, Alfreton and Somercotes
- Crowstones Road, Darley Dale, Derwent Valley
- B6053 Park Hill, Eckington & Killamarsh
- Coupe Lane, North Street to ‘Kalinber’ entrance, Clay Cross North
- C219 Yeoman Street, Bonsall, Wirksworth
- Platt Street, Padfield, from the cobbles at trail bridge to Redgate, Gloucester & Charlesworth
- Highfield View Road, Gloucester Rd to Tapton View Road, Loundsley Green and Newbold
- Lower Grove Road, Clarence Rd to Rutland Road, Chesterfield, Boythorpe and Brampton South
- Hambleton Avenue, Bright Street to No.41, North Wingfield, Clay Cross South
- Chapel Street, A6 Town Street to end, Duffield & Belper South
- St Martin’s Walk, King St into cul-de-sac, Hodthorpe, Bolsover North
- Foljambe Road, High Street to end of cul-de-sac, Brimington
- Bath Street, Pelham Street to Chapel Street/block paving, Ilkeston West/ Ilkeston East
- B6057 Sheffield Road, Northbound splitter onto Bowshaw roundabout, Dronfield East
- North Street, Cromford, Wirksworth
- C294 Chesterfield Road, Newboundmill Lane to county boundary at Meden Square, Pleasley, Shirebrook and Pleasley
- Foxwood Road, Sheepbridge Lane to Foxwood Way, Sheepbridge, St Mary’s
- Carter Lane/ Carter Lane West/ Little Lane, Alder Way to B6407, Shirebrook, Shirebrook and Pleasley
- A54 Macclesfield Main Road, various sections from the River Wye northwards for 710 metres, Buxton, Buxton West
- A619 Baslow Road, Westwick Lane to Holymoor Road, Holymoorside, Dronfield West and Walton
Our contractors will put up yellow signs giving the dates and times of each job.
Where possible we'll try to minimise disruption by working outside of key travel times. If we need to close the roads, diversions will be in place.
To find out exact times and dates please visit One Network and search for the road you're interested in.