Gritting routes and snow related road closures

Find out if your road is on a gritting route and when it was last gritted.


Our gritter drivers will report any problems they find on their routes. This includes roads that are closed or can't be gritted due to snow or other obstructions such as roadworks or parked cars.

During periods of very bad weather we may not be able to grit all routes as planned. Or we may find that where we've started gritting a route we are unable to continue.

The map doesn't include information about gritting of trunk routes, such as motorways and dual carriageways, which are the responsibility of the Highways Agency (opens in a new window). It doesn't include footpaths or cycle routes.

Our gritter drivers have notified us of the following road closures or roads not gritted on their routes. The location of these roads are shown on the map:

How to use the gritting map

Zoom button  To see the gritting routes in your area use the zoom or click on the map.

Search button  Search the map by postcode, street, town or village.

Mouse pointer  Click on a road to see when it was last gritted.

Route key

     Primary        Secondary        Tertiary        Partnership        Highways Agency

Find out about the different types of gritting routes.

Chapel Primary 5

Route details

Area: Chapel
Date: 10/12/2017
Started: 15:25
Completed: 23:00


Show all routes

Gritter log

Over the past 12 hours our gritters have been working on 72 routes to help keep Derbyshire's roads clear.

Show routes

Hide routes

picture of gritter Alfreton depot

  • P2 completed 10/12/2017 at 15.04
  • P2 completed 10/12/2017 at 20.59
  • P3 completed 10/12/2017 at 14.54
  • P3 completed 10/12/2017 at 21.27
  • S1 completed 10/12/2017 at 18.27
  • S2 completed 10/12/2017 at 18.15

picture of gritter Chapel depot

  • P1 completed 10/12/2017 at 21.45
  • P2 completed 10/12/2017 at 18.15
  • P3 completed 10/12/2017 at 22.45
  • P4 completed 10/12/2017 at 22.30
  • P5 completed 10/12/2017 at 23.00
  • P6 completed 10/12/2017 at 21.25
  • S1 completed 10/12/2017 at 14.55
  • S1 is being gritted
  • S2 completed 10/12/2017 at 15.50
  • S2 is being gritted
  • S3 completed 10/12/2017 at 14.50
  • S3 is being gritted

picture of gritter Darley Dale depot

  • H1 completed 10/12/2017 at 21.17
  • H2 is being gritted
  • P1 completed 10/12/2017 at 18.41
  • P2 completed 10/12/2017 at 18.50
  • P3 completed 10/12/2017 at 17.40
  • P3 is being gritted
  • S1 completed 10/12/2017 at 15.45
  • S1 is being gritted
  • S2 completed 10/12/2017 at 15.55
  • S2 is being gritted

picture of gritter Risley depot

  • P1 completed 10/12/2017 at 15.24
  • P1 completed 10/12/2017 at 20.33
  • P2 completed 10/12/2017 at 15.41
  • P2 completed 10/12/2017 at 21.04
  • S1 completed 10/12/2017 at 17.40
  • S2 completed 10/12/2017 at 18.32

picture of gritter Stonegravels depot

  • P1 completed 10/12/2017 at 18.00
  • P2 completed 10/12/2017 at 17.31
  • P2 completed 10/12/2017 at 20.50
  • P3 completed 10/12/2017 at 18.50
  • P3 completed 10/12/2017 at 20.40
  • P4 completed 10/12/2017 at 18.50
  • P4 completed 10/12/2017 at 20.55
  • P5 completed 10/12/2017 at 17.30
  • P6 completed 10/12/2017 at 19.30
  • P7 completed 10/12/2017 at 17.30
  • S1 completed 10/12/2017 at 14.50
  • S2 completed 10/12/2017 at 14.50
  • S3 completed 10/12/2017 at 14.55
  • S4 completed 10/12/2017 at 14.56
  • S5 completed 10/12/2017 at 14.50
  • S6 completed 10/12/2017 at 14.40
  • S7 completed 10/12/2017 at 16.15

picture of gritter Willington depot

  • P1 completed 10/12/2017 at 15.51
  • P1 completed 10/12/2017 at 20.07
  • P2 completed 10/12/2017 at 15.13
  • P2 completed 10/12/2017 at 21.46
  • P3 completed 10/12/2017 at 14.54
  • P3 completed 10/12/2017 at 20.39
  • S1 completed 10/12/2017 at 17.22
  • S2 completed 10/12/2017 at 19.05
  • S3 completed 10/12/2017 at 18.00

picture of gritter Wirksworth depot

  • P1 completed 10/12/2017 at 14.55
  • P1 completed 10/12/2017 at 21.17
  • P2 completed 10/12/2017 at 14.51
  • P2 completed 10/12/2017 at 21.38
  • P3 completed 10/12/2017 at 14.26
  • P3 completed 10/12/2017 at 21.21
  • S1 completed 10/12/2017 at 18.00
  • S1 is being gritted
  • S2 completed 10/12/2017 at 18.55
  • S2 is being gritted
  • S3 completed 10/12/2017 at 18.35
  • S3 is being gritted